close window |
Total EVAs: | 5 | ||
Total EVA time: | 32h 20m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 15.03.2008 | R. Linnehan | 7h 09m |
Assembling Special Purpose Dexterous Manipulator
(SPDM), named
Dextre by removing covers and installing arm
components on its main body. |
2 | 20.03.2008 | R. Behnken | 6h 24m |
Evaluating the Shuttle Tile Ablator-54. The Tile
Repair Ablator Dispenser, or T-RAD. They used TRAD to mix and squirt out the
STA-54 material into holes in several demonstration tiles. |
3 | 22.03.2008 | R. Behnken | 6h 02m |
Moving the Orbiter Boom Sensor System to a
temporary location on the station's main truss. They also installed a new
trundle bearing assembly in the starboard Solar Alpha Rotary Joint. |
4 | 19.11.2009 | R. Satcher | 6h 37m |
Installing a bracket for ammonia lines on the
Unity module. They lubricated the grapple mechanism on the Payload Orbital
Replacement Unit Attachment Device on the Mobile Base System. |
5 | 21.11.2009 | R. Bresnik | 6h 08m |
Installing the GATOR bracket to the Columbus
laboratory. They installed on the truss an antenna for wireless helmet camera
video. They also relocated the Floating Potential Measurement Unit that records
electrical potential around the station. |