close window

Garrett Erin "Big G" Reisman

 Total EVAs:  3
 Total EVA time:  21h 12m

No. Date Together with Time Main tasks and notes
 1  14.03.2008  R. Linnehan  7h 01m
Preparing the JEM ELM PS for its removal from the shuttle's payload bay.
 2  17.05.2010  S. Bowen  7h 25m
Installing a spare space-to-ground Ku-band antenna on the station's truss. Then they installed a new tool platform on Dextre. The spacewalkers breaked the torque on bolts holding batteries in place on the truss.
 3  21.05.2010  M. Good  6h 46m
Installing the final two new batteries on the truss and put the old batteries on the carrier. Next, they retrieved a grapple fixture from Atlantis' payload bay and brought it inside the station for use as a spare.