close window

Daniel Michio Tani

 Total EVAs:  6
 Total EVA time:  39h 11m

No. Date Together with Time Main tasks and notes
 1  10.12.2001  L. Godwin  4h 12m
Adding insulation blankets around two critical solar array drive, but they were unable to tighten up a solar array support truss
 2  28.10.2007  S. Parazynski  6h 33m
Disconnect Z1 to P6 truss cables and unbolt P6; outfit outside Node 2 with handrails, remote Node 2 berthing mechanism restraints; install grapple fixture on Node 2; configure squib firing unit on S1 truss for deploying radiators.
 3  20.11.2007  P. Whitson  7h 16m
Complete the exterior hookup of Harmony. Much of the spacewalk included the moving of a 300-pound, 18.5-foot fluid tray from its temporary location at the center of the station's main truss to Harmony.
 4  24.11.2007  P. Whitson  7h 04m
Complete the exterior hookup of Harmony. Much of the spacewalk included the moving of another 300-pound, 18.5-foot fluid tray from its temporary location at the center of the station's main truss to Harmony.
 5  18.12.2007  P. Whitson  6h 56m
Examination of the starboard Solar Alpha Rotary Joint (SARJ) and return a trundle assembly to the station's interior.
 6  30.01.2008  P. Whitson  7h 10m
Replacing a motor with electrical failures, the Bearing Motor Roll Ring Module (BMRRM), called the 'broom". Inspection of the starboard Solar Alpha Rotary Joint (SARJ).