Joseph Richard "Joe" Tanner

 Total EVAs:  7
 Total EVA time:  46h 29m

No. Date Together with Time Main tasks and notes
 1  15.02.1997  G. Harbaugh  7h 27m
HST-SM-02, mounting tools
 2  17.02.1997  G. Harbaugh  6h 34m
HST-SM-02, mounting tools
 3  04.12.2000  C. Noriega  7h 33m
Mounting P 6 solar array structure
 4  05.12.2000  C. Noriega  6h 37m
Mounting P 6 solar array structure
 5  07.12.2000  C. Noriega  5h 10m
Mounting P 6 solar array structure
 6  12.09.2006  H. Stefanyshyn-Piper  6h 26m
Installation of power and data cables between the P1 and P3/P4 structures in preparation for solar array deployment
 7  15.09.2006  H. Stefanyshyn-Piper  6h 42m
Performing final tasks required for activation of the Solar Alpha Rotary Joint (SARJ); they also prepared the P3/P4 truss and its solar arrays for operation by setting the stage for deployment of the truss' radiator