close window |
Total EVAs: | 7 | ||
Total EVA time: | 46h 29m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 15.02.1997 | G. Harbaugh | 7h 27m |
HST-SM-02, mounting tools |
2 | 17.02.1997 | G. Harbaugh | 6h 34m |
HST-SM-02, mounting tools |
3 | 04.12.2000 | C. Noriega | 7h 33m |
Mounting P 6 solar array structure |
4 | 05.12.2000 | C. Noriega | 6h 37m |
Mounting P 6 solar array structure |
5 | 07.12.2000 | C. Noriega | 5h 10m |
Mounting P 6 solar array structure |
6 | 12.09.2006 | H. Stefanyshyn-Piper | 6h 26m |
Installation of power and data cables between
the P1 and P3/P4 structures in preparation for solar array
deployment |
7 | 15.09.2006 | H. Stefanyshyn-Piper | 6h 42m |
Performing final tasks required for activation
of the Solar Alpha Rotary Joint (SARJ); they also prepared the P3/P4 truss and its
solar arrays for operation by setting the stage for deployment of the truss'
radiator |