close window

Peter Jeffrey Kelsay Wisoff

 Total EVAs:  3
 Total EVA time:  19h 53m

No. Date Together with Time Main tasks and notes
 1  25.06.1993  G. Low  5h 50m
EURECA communications antennas manually positioned for latching, evaluation of EVA activity tools and techniques
 2  16.10.2000  M. Lopez-Alegria  7h 07m
Pressurized Mating Adapter 3 was installed on the Unity Connecting Module nadir port.
 3  18.10.2000  M. Lopez-Alegria  6h 56m
The Z1 utility tray was deployed and its umbilical launch restraints released. The Z1 Manual Berthing Mechanism latches was cycled and opened. Wisoff and Lopez-Alegria performed one safety protocol test -- a flight evaluation of SAFER.