close window |
| Total EVAs: | 3 | ||
| Total EVA time: | 20h 14m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 22.05.2025 | Chen Dong | 7h 59m |
They installed the space debris protection
device that had been exited through the cargo airlock and inspection and
disposal of extravehicular equipment and facilities |
| 2 | 26.06.2025 | Chen Dong | 6h 25m |
They completed the installation of a debris
protection device and the inspection and maintenance of external equipment, as
well as the installation of foot restraint adapters and interface adapters,
which shorten future spacewalks by approximately 40 minutes. |
| 3 | 25.09.2025 | Wang Jie | 5h 50m |
Installing space debris protection equipment on
the space station and inspecting external equipment and facilities |