close window
Tang Shengjie
Total
EVA
s:
1
Total
EVA
time:
7h 30m
No.
Date
Together with
Time
Main tasks and notes
1
21.12.2023
Tang Hongbo
7h 30m
The main task was a minor solar array repair due to damages caused by micro meteoroids and debris.