close window |
| Total EVAs: | 2 | ||
| Total EVA time: | 12h 37m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 15.08.2025 | Chen Dong | 6h 47m |
Installing the space station's debris shield and
extravehicular auxiliary facilities, and inspecting extravehicular equipment
and facilities. |
| 2 | 25.09.2025 | Chen Zhongrui | 5h 50m |
Installing space debris protection equipment on
the space station and inspecting external equipment and facilities |