close window

Wang Jie

 Total EVAs:  2
 Total EVA time:  12h 37m

No. Date Together with Time Main tasks and notes
 1  15.08.2025  Chen Dong  6h 47m
Installing the space station's debris shield and extravehicular auxiliary facilities, and inspecting extravehicular equipment and facilities.
 2  25.09.2025  Chen Zhongrui  5h 50m
Installing space debris protection equipment on the space station and inspecting external equipment and facilities